Enter your Postal Code

Building Structural Work Up to the Plastering Stage With Materials Basis

Brand:Easy Nirman Services

Product Code:CONS001

Seller : Easy Nirman Retails

Availability: In Stock

Price: ₹ 650.00
Ex Tax: ₹ 650.00
Quantity:
This product has a minimum quantity of 1000

Our Rate for Structural Work Starts from Rs.600 Per Sq.Ft & May go upto Rs.700/-

depending on the Location, Plinth Area, Front Elevation Designs & Roofing Pattern.

Our Structural Work Contract Rate per Sq.Ft would get fixed between this range of Rs.600/- & Rs  700/-;

Depending on your Location, Plinth Area, Elevation & the Roofing Pattern you choose to construct your Home.

Whatever is the rate; all the below given Specifications would remain the same and therefore the Full & Final Rate can only be confirmed after you finalize the floor Plan and the Elevation of your proposed Home. If you needmore information on our rates; please don’t hesitate to call our 24/7 Helpline Number: +91-7247272727.

 

  1. EARTH WORK EXCAVATION:
  • Foundation Trenches, for all clauses of soil including cutting, Shoring, Strutting, dewatering etc. For column Foundation : As per Structural Drawing

          Rubble Foundation : As per Structural Drawing

  1. PCC BELOW COLUMN FOUNDATION:
  • Plain Cement Concrete 1:4:8 using 20MM downgraded aggregates as per Standard Architectural Specification.
  1. RCC COLUMN FOOTING:
  • Reinforced Cement Concrete 1:2:4 using 20MM as per Standard Architectural Specification.
  1. RR FOUNDATION WORK:
  • 60cm x 60cm fitting and packing with available soil
  1. RR BASEMENT:
  • 45cm x 45cm in cement mortar 1:6 as per Standard Architectural Specification
  1. RCC BELT:
  • Reinforced Cement Concrete in 1:2:4 as per Architectural Drawings, Size shall be 45 x 10 as per Standard Architectural Specification.
  1. FILLING IN BASEMENT:
  • Filling in basement shall be done with available Red Earth or Slurry Dust
  1. RCC COLUMNS:
  • RCC shall be build using 20mm Downgraded aggregates in M20 Mix as per the given structural drawings.
  1. RCC BEAMS:
  • RCC Beams shall be build; using 20mm Downgraded aggregates in M20 Mix as per the give
  1. RCC SLABS:
  • RCC Slabs with minimum 10CM thickness shall be build; using 20mm Downgraded aggregates in M20 Mix as per the given structural drawings.
  1. RCC SUN SHADES:
  • RCC Sun Shades shall be build; using 20mm Downgraded aggregates in M20 Mix as per Standard Architectural Specification
  1. RCC STAIRS:
  • RCC Stairs shall be build; using 20mm Downgraded aggregates in M20 Mix as per Standard Architectural Specification
  1. RCC LINTEL:
  • RCC Lintel shall be build; using 20mm Downgraded aggregates in M20 Mix as per the given structural drawings.
  1. LATERATE WORK:
  • Good Quality Laterate Masonry in 20cm thick; Cement Mortar in 1:6
  1. Client may opt for Good Quality Semi Wire-Cut Brick instead of Laterate; @Rs.60/- Extra/Sft
  1. PARAPET WORK:
  • Single Brick Work shall be used for the Parapet Work

 

  1. PCC BELOW FLOORING:
  • Plain Cement Concrete 1:4:8 as per Standard Architectural Specification
  1. INSIDE PLASTERING WORK:
  • Inside Plastering Work shall be in Cement Mortar 1:6, 9 to 12 MM Thick
  1. CEILING PLASTERING WORK:
  • Ceiling plastering work shall be in 1:3 Cement Mortar, below 10MM Thick.
  1. OUTSIDE PLASTERING WORK:
  • Outside wall Plastering Work shall be in Cement Mortar 1:5, 12 to 15 MM Thick.
  1. REINFORCED STEEL:
  • Fixing Steel Reinforcement (High Yield Strength Deformed Bars Conforming to Fe 500) for R.C.C in all items, Work including transporting, recoiling, cutting, straightening, bending and placing in position at all levels & binding with approved gauge binding wire.
  1. CEMENT:
  2. 43 Graded Ordinary Portland cement or Portland Pozzolana Cement of Ambuja, Ultratech, J P Laxmi, or Equivalent shall be used for all the works.
  3. SAND:
  • Good Quality Crushed M-Sand (POABS) shall be used for all RCC and Super Structural Works, Good Quality River Sand or Crushed M-Sand which is specially graded for the plastering purpose shall be used for all plastering works as per the availability in open Market.
  1. ANTI-TERMITE TREATMENT:
  • Against attack by subterranean termites; Chemical Treatment shall be implemented by experts having special know-how to ensure uniform distribution and proper penetration.
  1. JOINERY WORK:
  • To Execute the Joinery Works; the entire window Frames (with Bars & Rods) and Door

            Frames should be provided by the Client at Site. But If the Client opts for the same to be

supplied by Easy Nirman; then we charge about Rs.110/- to Rs.140/- Extra per Sq.Ft for Good Quality Imported Hard Wood (Merbau).

 

Write a review

Note: HTML is not translated!

Rating: Bad Good

Enter the code in the box below: